Site visit details

Overview

Catchment Yarra River
Site Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500
Date and Time Tuesday 29th May 2007 13:45pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 6.2 1280 0.03 8.2 16.5 14.5 10
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Flowing
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Good rainfall flowed through the creek over the past 24 hrs which assisted in cleaning up the water and topping up levels. Carried out a quick bug sample with little or no bugs present apart from several backswimmers. Our DO test had to be redone on Saturday as we had trouble with the bottle again.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au