Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
29 May 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Tuesday 29th May 2007 13:45pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 6.2 | 1280 | 0.03 | 8.2 | 16.5 | 14.5 | 10 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Flowing |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Good rainfall flowed through the creek over the past 24 hrs which assisted in cleaning up the water and topping up levels. Carried out a quick bug sample with little or no bugs present apart from several backswimmers. Our DO test had to be redone on Saturday as we had trouble with the bottle again.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au