Waterwatch Data Portal
ME_YPL949 Wetland 2@ Yallambie Creek, Simpson Barracks Watsonia
2 June 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Wetland 2@ Yallambie Creek, Simpson Barracks Watsonia ME_YPL949 |
Date and Time | Saturday 2nd June 2007 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 7 | 60 | 0 | 7.6 | 11.5 | 10.5 | 15 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | still |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Water levels at both wetlands much higher this month which contributed towards good chemical results. Apart from slight turbidity the wetlands are in great shape with plenty of frogs calling. Bug activity present but no samples taken this month. Will wait until spring. Next to wetlands 2 at Rentons Ridge, there is another shallow pondage which is showing signs of activity, plenty of frog calls. Apart from several yabbies. Will wait until water level increases before start bug sampling.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au