Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
24 June 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Sunday 24th June 2007 10:45am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.01 | 9.2 | 740 | 0.02 | 8 | 3 | 6 | 10 |
Weather | Foggy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Flowing |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Frosty as well as foggy. Water was flowing near the footbridge which enabled me to take a good water sample this month. I found the salinity reading to be a little high this month. There was plently of rubbish clinging to vegetation in the water and also in the bank edges. Cleaned up several large bags full. No bug samples this month due to the cold weather and time of year. Will start sampling again in spring. This months data covers a full year of sampling at the creek, and should provide us with an overall picture of what has been happening at the creek during peak and drought periods.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au