Waterwatch Data Portal
ME_YDW002 Treatment Pond next to the Darebin Creek and CSR Ready mix Preston Plant, Thornbury.
22 November 2008
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Treatment Pond next to the Darebin Creek and CSR Ready mix Preston Plant, Thornbury. ME_YDW002 |
Date and Time | Saturday 22nd November 2008 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 4.2 | 230 | 0.05 | 7 | 11 | 12 | 15 |
Weather | Rain |
---|---|
Last rainfall | Raining now |
Flow estimate | None |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall event monitoring. Pond 90% full at time of sampling. (due to rainfall) Ammonium result was 0 for visocolor, 0.74 with Smart 2. Samples not filtered. Do sampled with Smart 2, not visocolor. Phosphate sampled with Smart2.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au