Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
21 November 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Friday 21st November 2008 16:20pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 2900 | 0.02 | 9 | 21.5 | 18.9 | 5 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 40.00 |
Stream width | 1.00 |
Hazards | |
Litter/Pollutants |
1-2mm rain. No litter (unusual), much green water frond weed present in water, fish fingerlings visible. Photos taken.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au