Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
22 June 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Sunday 22nd June 2008 13:00pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | gusty winds and rainy, air temp 12 degrees. |
---|---|
Last rainfall | Raining now |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 50.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
all sites with water and gradual flow, quite a bit of shower activity in the past 3 days. Sites looking really good this week, all points of the creek were flowing well with additonal rain falling at the time of inspection. Water level: site 2 upstream- approx 50cm, downstream between 50-60cm.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au