Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Sunday 22nd June 2008 13:00pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather gusty winds and rainy, air temp 12 degrees.
Last rainfall Raining now
Flow estimate Normal base flow
Water Appearance
Stream depth 50.00
Stream width
Hazards
Litter/Pollutants
all sites with water and gradual flow, quite a bit of shower activity in the past 3 days. Sites looking really good this week, all points of the creek were flowing well with additonal rain falling at the time of inspection. Water level: site 2 upstream- approx 50cm, downstream between 50-60cm.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au