Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Saturday 30th May 2009 11:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 10 5 0.01 6.9 13.5 13.6 10
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 25.00
Stream width 1.50
Hazards
Litter/Pollutants
Approx 2mm rain. Photos taken. note - both springs running, banks very wet.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au