Waterwatch Data Portal
ME_EBU050 Bunyip River just downstream of Back Creek confuence, opposite Back Creek syphon
14 September 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bunyip River just downstream of Back Creek confuence, opposite Back Creek syphon ME_EBU050 |
Date and Time | Monday 14th September 2009 14:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 10.9 | 110 | 0.02 | 14 | 11 | 15 |
Weather | Overcast |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 1000.00 |
Stream width | 5.00 |
Hazards | |
Litter/Pollutants |
A lot of dumped industrial rubbish. Concrete, timber, rusty iron pipes. Good veg recruitment though.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au