Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300
Date and Time Sunday 8th March 2009 17:30pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 3 7400 7.7 20 18.1 20
Weather Sunny
Last rainfall More than a week ago
Flow estimate None
Water Appearance
Stream depth 5.00
Stream width 0.33
Hazards
Litter/Pollutants
Under 5mm rain. Pools rapidly diminishing, smaller and smaller. The concentrated water showed much salt. Was a small amount of rain last week, which soaked in. Again the pool was dry, but under blackberries are huddled the long necked turtle and all the fish.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au