Site visit details

Overview

Catchment Bunyip River
Site Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore ME_EME993
Date and Time Monday 11th August 2008 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.04 300 0.3 8 7 16 75
Weather Rain
Last rainfall Raining now
Flow estimate Fast
Water Appearance
Stream depth 5.00
Stream width 5.00
Hazards
Litter/Pollutants
Steady flow into bay from several small rain events over several days. Absorption basin continually full due to saturated soil.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au