Site visit details

Overview

Catchment Bunyip River
Site Merricks Beach Drainage: Surf St gutter, Merricks Beach ME_EME995
Date and Time Monday 27th April 2009 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 300 0.25 5 12 33
Weather Rain
Last rainfall Raining now
Flow estimate Fast
Water Appearance
Stream depth 5.00
Stream width 5.00
Hazards
Litter/Pollutants
High tides and strong winds caused major flows of seawater into the lower part of the creek the previous day to form a shallow lake. Rainfall overnight diluted the seawater and by the next morning (27th April 2009) the creek filled up and came close to flowing back into the sea but did not actually do so. Samples were taken at this time at 10am.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au