Waterwatch Data Portal
ME_EBA260 Balcombe Creek at Two Bays Road (Site 3), Mt Eliza
16 March 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (Site 3), Mt Eliza ME_EBA260 |
Date and Time | Sunday 16th March 2008 11:30am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | not specified |
Water Appearance | |
Stream depth | 0.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
last rainfall not specified. Still no water, no change from last week however creek line ground is quite moist. Area weed infested
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au