Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Sunday 6th April 2008 14:50pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather Sunny
Last rainfall Last 3 days
Flow estimate not specified
Water Appearance
Stream depth 24.00
Stream width
Hazards
Litter/Pollutants
last 2 days heavy rain and wind, a lot of debris around, 18 degrees air temp. Lots of life seen and heard today mainly birds and skinks. Evidence of high flows, lots of woody and rubbish debris, depressed reeds. Site 2 downstream has water where we normally access the creek and in the underground tunnels.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au