Waterwatch Data Portal
ME_EBA230 Balcombe Creek at Two Bays Road (site 1), Mt Eliza
11 May 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (site 1), Mt Eliza ME_EBA230 |
Date and Time | Sunday 11th May 2008 14:30pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Temporary |
Water Appearance | |
Stream depth | 100.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
last rainfall not specified. Creek clearly has more water in it at all sites and at other visible points, however doesn't appear to be flowing. Lots of traffic noise, appears to be some general weed maintenance.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au