Waterwatch Data Portal
ME_EBA260 Balcombe Creek at Two Bays Road (Site 3), Mt Eliza
19 May 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Two Bays Road (Site 3), Mt Eliza ME_EBA260 |
Date and Time | Monday 19th May 2008 17:45pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 18.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
all sites have a considerable amount of water in them after heavy rains on the weekend. air temp 15 degrees.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au