Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Tuesday 9th June 2009 10:30am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Slow
Water Appearance
Stream depth 50.00
Stream width
Hazards
Litter/Pollutants
some showers during the day, coolish morning 12 degrees air temp. Site has improved from previous water elevels since 25/05/2008. Levels: upstream- variable between 40cm at Two Bays Road Bridge. Downstream: 50-62 at Two Bays Road Bridge.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au