Site visit details

Overview

Catchment Bunyip River
Site Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240
Date and Time Saturday 5th July 2008 00:00am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather cool, 12 degrees air temp
Last rainfall More than a week ago
Flow estimate Slow
Water Appearance
Stream depth 50.00
Stream width
Hazards
Litter/Pollutants
last rainfall not specified, all sites with water and gradual flow. Water levels: site 2- upstream: under 40cm, downstream: between 50-60cm. Site upstream appears to have a lot fo water init, though in some spots seems quite shallow, unsure if this is due to the Cumbungi (Typha domingensis) photos tend to suggest this site is doing fine. Some rubbish around site 2 downstream. Site 2 returning some unusal results, might be on account of Cumbungi though- photos perhaps telling the story best here.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au