Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Two Bays Road (Site 3), Mt Eliza ME_EBA260
Date and Time Sunday 22nd June 2008 14:00pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample
Weather gusty winds and rainy, air temp 12 degrees
Last rainfall Raining now
Flow estimate Normal base flow
Water Appearance
Stream depth 35.00
Stream width
Hazards
Litter/Pollutants
all sites with water and gradual flow, quite a bit of shower activity in the past 3 days. Sites looking really good this week, all points of the creek were flowing well with additonal rain falling at the time of inspection.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au