Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 23rd May 2009 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.07 4 380 0.07 7 13 9.5 20
Weather Cloudy
Last rainfall More than a week ago
Flow estimate None
Water Appearance
Stream depth 0.80
Stream width 10.00
Hazards
Litter/Pollutants
waterway depth & width - were estimated. Air Temperature - The flow was a little surprising . The water seemed a little deeper than last time, but it was not flowing. It is possible that thee may be a barrier further downstream that is damming the pool where we test.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au