Site visit details

Overview

Catchment Yarra River
Site Darebin Creek at Greenhills Rd, Bundoora ME_YDA290
Date and Time Monday 15th June 2009 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 1420 7.5 6 7
Weather Sunny
Last rainfall Last 7 days
Flow estimate Normal base flow
Water Appearance
Stream depth 20.00
Stream width 3.00
Hazards
Litter/Pollutants
Water Width - Estimated to 3m. Last Rainfall - At Mill Park I recorded about 20mm over 5 days, early last week. Sample site is in flowing water just about a riffle, after a long section of sheltered reedy waterway. There are several willows shading the sampling point. The water today was flowing pretty much typical . The water level was 19cm below my reference point, which is 7cm higher than when mentioned last month.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au