Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, upstream of Lillimer drain, Heidelberg West. ME_YDA420
Date and Time Wednesday 6th May 2009 10:50am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.35 5 1290 0.03 8.1 15 11.5
Weather Sunny & Cloudy
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 40.00
Stream width 1.00
Hazards
Litter/Pollutants
Micheal Sephton was the monitor on this Occasion, due to experiment of the equipment tests with Emma Mann. D.O - Soilds not completely dissolved, despite addtion of 2 drops sulfuric acid after 5 minutes. Phosphate - 0.08 mg/L (If using Lamotte Smart 2: Multiply by 0.326 = 0.026 mg/L).

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au