Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 27th June 2009 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 9 330 0.05 6.6 9.6 8.4 50
Weather Cloudy
Last rainfall Last 7 days
Flow estimate Normal base flow
Water Appearance
Stream depth 600.00
Stream width 10.00
Hazards
Litter/Pollutants
About 3 mm of rain has fallen during the past 4 or 5 days, but not in the last 2 days. There is a lot of suspended soil in the water (typical).

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au