Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, Dundas Street Drain or Cave Clan Drain (upstream footbridge and Dundas St wetland) Thornbury/Ivanhoe ME_YDA534
Date and Time Saturday 20th December 2008 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 1220 0.34 7.8 18 19.5 10
Weather Sunny
Last rainfall Last 7 days
Flow estimate not specified
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Ammounium- over range (visocolor (water temp :26 c result > 0.5. Water Appearence - Grey Water.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au