Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
25 July 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 25th July 2009 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 6 | 300 | 0.1 | 6.5 | 13.6 | 9.1 | 40 |
Weather | Cloudy |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 60.00 |
Stream width | 10.00 |
Hazards | |
Litter/Pollutants |
8 mm of rain Measured ammonium & phosphate at room temperature 20 degrees. Minor quantity of pollutants observed: 1 can, 1 small piece of paper, 1 small plastic jar, 2 tennis balls. Rate of flow is "normal" following moderate rain, as is generally the case in winter.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au