Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
1 July 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 1st July 2007 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 7.5 | 120 | 8.2 | 13 | 10 | 400 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | n/r |
Water Appearance | |
Stream depth | 50.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
10mm last 24/48hr. very heavey rain last wed/thurs. water so turbid that can't test turbidity. Reported to Keith Loveridge at council 3/7/07. Noticed high turbidity coming from drain for last week.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au