Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
16 October 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Friday 16th October 2009 09:10am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 14.4 | 12.4 | 80 |
Weather | Cloudy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 100.00 |
Stream width | 6.50 |
Hazards | |
Litter/Pollutants |
15.6mm rain in last 3 days CHANGES: less turbid. STANDOUTS: Pole from a sign, still in water underbridge, Melbourne Water will remove it before the festival ar Edendale Farm OTHER: lots of interested passers-by! Specially school groups.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au