Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, under Dundas St footbridge, Thornbury/Ivanhoe ME_YDA535
Date and Time Saturday 28th November 2009 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.39 2.5 420 7.2 21 21
Weather sunny & windy
Last rainfall Last 3 days
Flow estimate Normal base flow
Water Appearance
Stream depth 40.00
Stream width 2.00
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au