Waterwatch Data Portal
ME_EME994 Merricks Beach Drainage: Drain alongside tennis courts
13 June 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Beach Drainage: Drain alongside tennis courts ME_EME994 |
Date and Time | Friday 13th June 2008 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 200 | 5 | 6.9 | 15 | 12 | 150 |
Weather | Not Recorded |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Not Recorded |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Beach flow. 30mm rain. E.coli = >8000.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au