Waterwatch Data Portal
ME_EME140 Merricks Creek at private jetty
28 March 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Creek at private jetty ME_EME140 |
Date and Time | Saturday 28th March 2009 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 0.05 | 8.3 | 21.4 | 18.8 |
Weather | Sunny |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Not Recorded |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
9mm rain. EC over meter range. There are roadworks happening on Balnarring Beach Rd. Dirt and concrete have been put on it and a lot was washed into the creek. Not sure if the drainage has been changed though because main turbidity seems to be upstream of the bridge. very high alkalinity due to concrete but still young Bream in creek.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au