Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Friday 15th January 2010 10:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 10 5760 0.01 7.8 25 21.3 10
Weather Sunny
Last rainfall More than a week ago
Flow estimate Slow
Water Appearance
Stream depth 50.00
Stream width 1.00
Hazards
Litter/Pollutants
smelly, scummy, algal bloom evident near pipes, 30m downstream from site with much dead weed, estuary 50 m downstream major bloom, dead slimy weed, two pools of blackish dead weed. photos.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au