Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Sunday 28th February 2010 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 5570 0.01 6.9 18 17.9 10
Weather Cloudy
Last rainfall Last 3 days
Flow estimate medium - slow
Water Appearance
Stream depth 2.00
Stream width 2.00
Hazards
Litter/Pollutants
2metre deep and 20mm wide pools and stream is an average. 3 photos taken, 1 saved in data file for Tanti Friends. Debris still upstream from floods, 4 springs oozing water into site, site very open, woody weeds have been removed [since last time].

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au