Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 16th March 2010 11:25am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 20.6
Weather Sunny
Last rainfall Last 7 days
Flow estimate None
Water Appearance
Stream depth 0.00
Stream width 0.00
Hazards
Litter/Pollutants
54.4 mm rain in G'borough in last 2 days. Lots of debris on river bank close to drain due to high rain flows. Plenty River looks very muddy in this section. River level looks a little lower in this section than last sampling. Only air temp sampled, on concrete pad.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au