Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
16 March 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 16th March 2010 11:25am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 20.6 |
Weather | Sunny |
---|---|
Last rainfall | Last 7 days |
Flow estimate | None |
Water Appearance | |
Stream depth | 0.00 |
Stream width | 0.00 |
Hazards | |
Litter/Pollutants |
54.4 mm rain in G'borough in last 2 days. Lots of debris on river bank close to drain due to high rain flows. Plenty River looks very muddy in this section. River level looks a little lower in this section than last sampling. Only air temp sampled, on concrete pad.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au