Site visit details

Overview

Catchment Yarra River
Site Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693
Date and Time Tuesday 15th December 2009 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 7 530 0.08 7.1 19.6 19.2 45
Weather Sunny
Last rainfall More than a week ago
Flow estimate Good, moderate flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
DO 2 tests taken: 7 (Julia) , 6 (Joe). Sampled before footbridge, water flowing little sluggishly Ammonium , 2 tests done: (0.02 (Julia), and 0.0 (Joe)) Conductivity , 2 tests done : (530 (Julia), 540 (Joe)) pH , 2 tests done, results identical. Ammonium and Phosphate samples filtered once air temperature taken under bridge Total phosphate (Ecowise taken @ 8:40am) 0.13mg/L P, E. coli = 380

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au