Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Saturday 29th May 2010 16:05pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 1435 0.03 8.6 15 14.9 16
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Fast
Water Appearance
Stream depth 30.00
Stream width 1.50
Hazards
Litter/Pollutants
less than 1mm rain. litter was found photo taken 1 x downstrem from the bridge 1x upstream from the bridge.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au