Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9) ME_EBA850
Date and Time Saturday 18th September 2010 09:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 8 1210 0.1 5 7.4 10.5 10 10
Weather Rain
Last rainfall Raining now
Flow estimate Slow
Water Appearance
Stream depth 70.00
Stream width 5.00
Hazards
Litter/Pollutants
Water levels down about 30cm from last readings. Estuary open. Rainfall since last reading 81mm.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au