Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
13 May 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Thursday 13th May 2010 13:55pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.01 | 8 | 260 | 0.1 | 9.3 | 15.1 | 16.1 | 30 |
Weather | sunny and cloudy |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 1.00 |
Stream width | 1.00 |
Hazards | |
Litter/Pollutants |
There is flow due to recent rain. Little bit of foam in water this time. Pleny River is very turbid in this section. Note: Phosphate and Ammonium were tested on 14/5/2010 at 22.4 'C. Air temperature was measured on concrete pad. pH is very alkaline- a concern
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au