Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Thursday 13th May 2010 13:55pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.01 8 260 0.1 9.3 15.1 16.1 30
Weather sunny and cloudy
Last rainfall Last 24 hrs
Flow estimate Slow
Water Appearance
Stream depth 1.00
Stream width 1.00
Hazards
Litter/Pollutants
There is flow due to recent rain. Little bit of foam in water this time. Pleny River is very turbid in this section. Note: Phosphate and Ammonium were tested on 14/5/2010 at 22.4 'C. Air temperature was measured on concrete pad. pH is very alkaline- a concern

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au