Site visit details

Overview

Catchment Bunyip River
Site Edithvale Wetlands outflow north of Edithvale Rd ME_DED200
Date and Time Saturday 17th April 2010 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 6 2800 0.01 7.4 20 17 10
Weather Sunny
Last rainfall Last 3 days
Flow estimate Permanent
Water Appearance
Stream depth 25.00
Stream width
Hazards
Litter/Pollutants
rainfall 15 2010 0.2mm at moorabbin airport. bed of water covered with plant growth.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au