Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
16 February 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 16th February 2010 09:45am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 9 | 2800 | 0.25 | 8.8 | 22.7 | 19.3 | 10 |
Weather | Overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 0.50 |
Stream width | 0.20 |
Hazards | |
Litter/Pollutants |
less flow this time, good flow in Pleny River, water in drain looks clear, flowing over days due to mass on concrete, slight foam when agitated.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au