Site visit details

Overview

Catchment Bunyip River
Site Private Property Spring (CUM01 to Tarago group). ME_ETG001
Date and Time Monday 17th May 2010 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.1 316 0.12 7.6 17 13.7 42
Weather Cloudy
Last rainfall Last 7 days
Flow estimate Permanent
Water Appearance
Stream depth 40.00
Stream width 1.00
Hazards
Litter/Pollutants
time not specified. Depth and width confusing. ("40-100cm") other parameters measured: TDS mg/L: 252 Ammonium: 0.101mg/L salinity: 50.8mg/L

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au