Waterwatch Data Portal
ME_EWA080 Warringine Creek downstream of Henderson/Boes Rd bridge
30 September 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Henderson/Boes Rd bridge ME_EWA080 |
Date and Time | Thursday 30th September 2010 13:10pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 2100 | 0.07 | 7.1 | 15.4 | 11.4 | 10 |
Weather | Cloudy |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 17.00 |
Stream width | 8.00 |
Hazards | |
Litter/Pollutants |
what has changed? pipe across creek just inder the water. water flowing teadily over the creek, white froth along edges of the pipe. what stands out about the site? dead braches across half the creek and vlocking 2 arches of the bridge, 1 arch blocked with time, 2 arches free of debris but not flowing. other: n/a
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au