Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
15 June 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 15th June 2010 15:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 9 | 800 | 0.07 | 8.2 | 11.8 | 12.1 | 15 |
Weather | Cloudy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 0.50 |
Stream width | 0.01 |
Hazards | |
Litter/Pollutants |
Water appearance : Little frothy
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au