Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 12th October 2010 09:50am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 5 750 0.02 8 17.4 16.2 50
Weather Overcast
Last rainfall Last 7 days
Flow estimate Trickle
Water Appearance
Stream depth 0.10
Stream width 0.10
Hazards
Litter/Pollutants
rain: 10mm 6 days ago what has changed since last time you monitored? build up of sludge on drain outlet platform water level lower than last couple of months- deposition of gravel and sediment in River is evident.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au