Waterwatch Data Portal
ME_ESU100 Sunshine Creek at upper site on left side of split
4 October 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at upper site on left side of split ME_ESU100 |
Date and Time | Monday 4th October 2010 15:27pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 20.00 |
Stream width | 70.00 |
Hazards | |
Litter/Pollutants |
Creek flow trickling over track. 4 days since last rain 3.4mm on 30/09/2010. Orange coloured growth adhering to submerged objects (Iron bacteria). No foaming on water surface. Creek running freely.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au