Waterwatch Data Portal
ME_EWA080 Warringine Creek downstream of Henderson/Boes Rd bridge
28 August 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Henderson/Boes Rd bridge ME_EWA080 |
Date and Time | Saturday 28th August 2010 13:09pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 500 | 0.07 | 6.7 | 15 | 10.7 | 20 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 33.00 |
Stream width | 4.00 |
Hazards | |
Litter/Pollutants |
25cm diameter culvert has been put under the creek bed at the bridge in the last two days. Water is flowing fast over 2m of the creek rather than just 5-1.0m the conductivity is very different.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au