Waterwatch Data Portal
ME_ESU100 Sunshine Creek at upper site on left side of split
3 January 2011
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at upper site on left side of split ME_ESU100 |
Date and Time | Monday 3rd January 2011 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 1250 | 0.01 | 6.4 | 17.2 | 15 | 30 |
Weather | Cloudy |
---|---|
Last rainfall | Last 7 days |
Flow estimate | None |
Water Appearance | |
Stream depth | 11.00 |
Stream width | 0.60 |
Hazards | |
Litter/Pollutants |
Creek not flowing. Orange coloured growth adhering to submerged objects (Iron bacteria). Turbidity has a strong orange colour.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au