Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
18 January 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 18th January 2011 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.2 | 10 | 720 | 0.18 | 8.9 | 17.3 | 19 | 200 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 0.10 |
Stream width | 0.20 |
Hazards | |
Litter/Pollutants |
River flowing fast, drain looks dirty, like its been carrying sediment, River has been up high recently , and scouring the banks mud on the concrete pad, suds in river, scoured banks shopping trolley between YPL 697 and YPL698
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au