Waterwatch Data Portal
WG_MOR512 MOE RIVER at Trafalgar- Drained
31 August 2007
Site visit details
Overview
Catchment | Latrobe River |
---|---|
Site | MOE RIVER at Trafalgar- Drained WG_MOR512 |
Date and Time | Friday 31st August 2007 13:14pm |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | FrP mg/L P | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 409 | 6.77 | 0.03 | 14.77 | 13.6 | 26 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
The river had medium flow& turbidity had a further, slight improvement. No litter was present. This was test #7 in 2007. Aiming for 11 to meet EPA standard.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au