Site visit details

Overview

Catchment Goulburn River
Site Jims Gully at Creightons Creek GB_JIM010
Date and Time Sunday 20th March 2011 00:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 290 7.2 16
Weather sunny
Last rainfall During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall: 34mm in March since 28 Feb. EC: 50 Units Higher. Turbidity: Lower turbidity as flow slows

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au