Waterwatch Data Portal
GB_BRI010 Bridge Creek before entering Broken River at Whitfield Road.
27 December 2010
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Bridge Creek before entering Broken River at Whitfield Road. GB_BRI010 |
Date and Time | Monday 27th December 2010 15:20pm |
Approved | Approved |
Physical Chemical Tests
Bioc mg/L | D.O. % | D.O mg/L | EC µS/cm | GB Height m | pH pH Units | Rain mm | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 119 | 8 | 19.1 | 12 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 0 |
Flow estimate | Rapid |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Zero mm rain past 48 hours. High flow. Significant erosion along east bank, including fence post washed out and tree collapsed into creek. Electricity pole half washed out and channel scoured. 8/12/2010 Major Flood event occurred which is the second flood for 2010/2011 summer.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au