Site visit details

Overview

Catchment Broken River
Site Bridge Creek before entering Broken River at Whitfield Road. GB_BRI010
Date and Time Monday 27th December 2010 15:20pm
Approved Approved

Notes

Physical Chemical Tests

Bioc mg/L D.O. % D.O mg/L EC µS/cm GB Height m pH pH Units Rain mm rP mg/L P Water ° C P mg/L Turb NTU
Sample 119 8 19.1 12
Weather
Last rainfall During the last 24 hours 0
Flow estimate Rapid
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Zero mm rain past 48 hours. High flow. Significant erosion along east bank, including fence post washed out and tree collapsed into creek. Electricity pole half washed out and channel scoured. 8/12/2010 Major Flood event occurred which is the second flood for 2010/2011 summer.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au