Site visit details

Overview

Catchment Campaspe River
Site DUPLICATE_Axe Creek @ bottom of Contribution Creek_DUPLICATE NC_AXE050_DUPLICATE
Date and Time Monday 6th June 2011 09:45am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 660 7.2 0.02 7 40
Weather cloudy
Last rainfall During the last week 4.2
Flow estimate Permanent
Water Appearance Other: Turbid
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Good 4 Fair 6 Good 8 Fair 3 Fair 6 Fair 27

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au